Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified

Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified
Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified
Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified
Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified
Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified
Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified
Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified
Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified
Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified

Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified

Eaton NETWORK-M3

CA$533.00 CA$654.00 Save CA$121
Authorized Partner
Brand New
Availability: In stock , ready to be shipped .
  • Free Shipping
  • 2 Year Warranty
  • 30 Day Returns
  • Carbon Neutral

Product Key Features

  • Reliable Gigabit Ethernet connectivity for UPS and PDU
  • UL 2900-1 and IEC 62443-4-2 certified for enhanced security
  • Easy installation and integration into existing network infrastructure
  • Compact design for space-saving installation
  • Fast and secure data transfer for efficient power management
CA$533.00
FREE Returns

FREE Returns from CANADA

FREE Delivery
Order in the next

hrs

mins

to be delivered on

Shipping information

-
+
Ask Our Experts
Call Us Now
888.267.9566
For every order we

Plant 1 tree & plant 1 calp

Offset 1 kg of CO2

Rescue 1 plastic bottle

Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified

Eaton NETWORK-M3

CA$533.00 CA$654.00 Save CA$121
Authorized Partner
FREE Returns
Brand New
Availability: In stock , ready to be shipped .
  • Free Shipping
  • 2 Year Warranty
  • 30 Day Returns
  • Carbon Neutral
CA$533.00
FREE Returns
-
+
FREE Delivery
Order in the next

hrs

mins

to be delivered on

Shipping information

FREE Returns from CANADA

Ask Our Experts
Call Us Now
888.267.9566
For every order we

Plant 1 tree & plant 1 calp

Offset 1 kg of CO2

Rescue 1 plastic bottle

Product Key Features

  • Reliable Gigabit Ethernet connectivity for UPS and PDU
  • UL 2900-1 and IEC 62443-4-2 certified for enhanced security
  • Easy installation and integration into existing network infrastructure
  • Compact design for space-saving installation
  • Fast and secure data transfer for efficient power management
Minimize
Info
Info Page
Reviews Top
×

×
  • Description
  • Tech Specs
  • Refund Policy

Eaton

NETWORK-M3

UPS Connectivity Device Certified to Strict Cybersecurity Standards

This Gigabit network card for UPS systems and PDUs meets both UL 2900-1 and IEC 62443-4-2 cybersecurity standards, empowering IT professionals with superior Gigabit speed, capabilities and features, while ensuring the highest level of defense against emerging cybersecurity threats. A user-configurable firewall provides an extra layer of security to protect connected equipment from unauthorized access and cyberattacks.

Hardware Root of Trust Enables Enhanced Security

The NETWORK-M3's innovative security features use a secure boot process that authenticates any attached firmware to ensure its authorized status and acts as a bottleneck to prevent a cyberattack from spreading if/when a threat exists. This "zero trust architecture" detects intrusions and locks down sensitive information for a level of security you can rely on. Email alerts are sent through secure SMTP and can be integrated with Google Workspace and Office365.

Widely Compatible with Eaton Power Management Software

The NETWORK-M3 works with multiple Brightlayer Data Centers Suite power management software solutions that provide the deeply insightful intelligence into IT power usage that you need to streamline operations and prepare for future needs. They also enable extensive automation and remote management and control that shortens response times to power issues for more resilient uptime. Brightlayer Data Centers software suite includes: Data Center Performance Management (DCPM), Distributed IT Performance Management (DITPM), Visual Power Manager (VPM), Intelligent Power Manager (IPM), Visual Capacity Optimization Manager (VCOM) and cloud-based remote monitoring services (PredictPulse in North and South America, CSM [Cyber Secured Monitoring] in Europe, the Middle East and Africa).

Enables Remote UPS and PDU Management

NETWORK-M3 turns a compatible UPS system or PDU into a managed device on your network. It enables remote management of a UPS through load shedding and safe shutdowns, and reboots protected devices attached to load segments. It monitors site electrical data, UPS self-test logs, alert logs and logged power events like blackouts, brownouts and overvoltage conditions. You can receive alert notifications via email or SMS. Real-time clock links to a Network Time Protocol (NTP) server to maintain current day and date even after a UPS shutdown.

Designed for Convenient Operation

Zero-touch provisioning automatically commissions devices faster, saving time exponentially in large-scale deployments. A certificate manager helps create and distribute digital certificates to multiple devices, which reduces the administrative burden and streamlines UPS management. The NETWORK-M3 remote management card allows real-time monitoring from Google Chrome and Microsoft Edge web browsers.
Supports Multiple Protocols

Return Policy

Time to Return

Standard Return Policy

We offer a hassle-free 30-day returns policy for domestic (US) orders, excluding non-refundable items. Refund or Replacement within 30 days of the delivery date. All products that fall under the Standard Return Policy qualify for our 30-Day Hassle-Free Returns. Please see the section above for more details.

Replacement Only Return Policy

Replacement within 30 days of the delivery date.

Manufacturer Only Return Policy

Covered by the manufacturer's warranty. Please refer to the terms and conditions for the manufacturer's warranty or contact the manufacturer.

Holiday Extended Return Policies

Extended Holiday Return Policy.

Qualifying purchases of products displaying the " Extended Holiday Return Policy ", from November 1st, 2023 to December 25, 2023, are eligible for a Refund or Replacement until January 31, 2024.


Extended Holiday Replacement-Only Return Policy

Qualifying purchases of products displaying the " Extended Holiday Replacement-Only Return Policy ", from November 1st, 2023 to December 25, 2023, are eligible for a Replacement until January 31, 2024.

FAQ

Accessories

Add to cart

Similar Products

Add to cart

Recently Viewed Products

Compare Details Eaton NETWORK-M3 Gigabit Ethernet Card for UPS and PDU, UL 2900-1 and IEC 62443-4-2 Certified

TRENDnet TUC-ETG USB-C to Gigabit Ethernet Adapter, Windows & Mac Compatible, Energy Saving

TRENDnet TUC-ETG USB-C to Gigabit Ethernet Adapter, Windows & Mac Compatible, Energy Saving

HP 141J6AT Gigabit Ethernet Card, Workstation Compatible [Discontinued]

HP 141J6AT Gigabit Ethernet Card, Workstation Compatible [Discontinued]