Tripp Lite: 牌3XEVSR6G32B 30插座PDU,3相开关,32A,22.2KW,220/230V,24个C13,6个C19定制
Tripp Lite: 牌3XEVSR6G32B 30插座PDU,3相开关,32A,22.2KW,220/230V,24个C13,6个C19定制
Tripp Lite PDU3XEVSR6G32B
- Free Shipping
- 2 年 保修
- 30天退货
- 碳中和
产品关键特征
- 22.2kW 220/230V 3相切换1.8m 0U PDU
- 30个可单独控制的插座-24个C13,6个C19
- 内置LX平台界面,可实现全天候远程访问
- 带1.8m交流电源线的IEC 309 32A红色380/400V PDU输入
- 带触摸屏LCD,可通过QR码实现移动访问选项
Tripp Lite
PDU3XEVSR6G32B
PDU3XEVSR6G32B 22.2kW 3-Phase Switched Power Distribution Unit 提供先进的网络控制和远程电源监控功能,可以打开、关闭、重新启动或锁定每个插座的电源。通过减少现场访问的频率,这些先进的远程功能可以帮您节省费用并减少停机时间。
0U PDU 配备了30个带开关的220/230伏插座 (24个C13和6个C19),配有插头锁定套管,可防止电缆意外断开。带IEC 309 32A Red 380/400V插头的1.8米电缆将PDU连接到兼容的交流电源、发电机或受保护的UPS。
内置的无需Java的基于HTML5的LX平台网络接口通过安全的Web浏览器、SNMP、Telnet或SSH实现全面的远程访问,用于PDU状态监控和电子邮件通知。它支持10/100 Mbps自动感应,与以太网网络进行最佳通信。可选的EnviroSense2模块(单独出售)提供各种环境监测功能。支持的协议包括IPv4、IPv6、HTTP、HTTPS、SMTP、SNMPv1、SNMPv2c、SNMPv3、Telnet、SSH、CLI、FTP、DHCP和NTP。
彩色触摸屏 LCD 让您可以在菜单之间切换,监测每个相位的输入电流水平、每个负载块和每个插座的输出电流(精度为±1%的计费级准确度)、环境传感器数据和网络信息。它还生成一个独特的QR码,以允许通过移动设备访问可切换的PDU。
Return Policy |
Time to Return |
Standard Return Policy |
We offer a hassle-free 30-day returns policy for domestic (US) orders, excluding non-refundable items. Refund or Replacement within 30 days of the delivery date. All products that fall under the Standard Return Policy qualify for our 30-Day Hassle-Free Returns. Please see the section above for more details. |
Replacement Only Return Policy |
Replacement within 30 days of the delivery date. |
Manufacturer Only Return Policy |
Covered by the manufacturer's warranty. Please refer to the terms and conditions for the manufacturer's warranty or contact the manufacturer. |
Holiday Extended Return Policies |
Extended Holiday Return Policy.Qualifying purchases of products displaying the " Extended Holiday Return Policy ", from November 1st, 2023 to December 25, 2023, are eligible for a Refund or Replacement until January 31, 2024. Extended Holiday Replacement-Only Return PolicyQualifying purchases of products displaying the " Extended Holiday Replacement-Only Return Policy ", from November 1st, 2023 to December 25, 2023, are eligible for a Replacement until January 31, 2024. |