Baterai Eksternal Minuteman BP72XL 72 V DC 005 Jam Cadangan Beban Penuh Aki Timah
Baterai Eksternal Minuteman BP72XL 72 V DC 005 Jam Cadangan Beban Penuh Aki Timah
Minuteman BP72XL
- Free Shipping
- 1 Year Warranty
- 30 Day Returns
- Carbon Neutral
Product Key Features
- 72 V DC output voltage for reliable power supply
- Backup/Run Time of 0.05 Hour at full load and 0.17 Hour at half load
- Lead Acid battery chemistry for maintenance-free and spill-proof operation
- Compatible with Minuteman EC3000LCD UPS for seamless integration
- UL, cUL, CE, and FCC certifications for safety and quality assurance
- RoHS 2 environmental certification for eco-friendly operation
- Tower form factor for easy installation and placement
- 3-year limited warranty for peace of mind
- Maximum battery life of 5 years for long-lasting performance
- Weight of 89.30 lb for sturdy and durable construction
hrs
mins
Informasi pengiriman
Minuteman
BP72XL
Return Policy |
Time to Return |
Standard Return Policy |
We offer a hassle-free 30-day returns policy for domestic (US) orders, excluding non-refundable items. Refund or Replacement within 30 days of the delivery date. All products that fall under the Standard Return Policy qualify for our 30-Day Hassle-Free Returns. Please see the section above for more details. |
Replacement Only Return Policy |
Replacement within 30 days of the delivery date. |
Manufacturer Only Return Policy |
Covered by the manufacturer's warranty. Please refer to the terms and conditions for the manufacturer's warranty or contact the manufacturer. |
Holiday Extended Return Policies |
Extended Holiday Return Policy.Qualifying purchases of products displaying the " Extended Holiday Return Policy ", from November 1st, 2023 to December 25, 2023, are eligible for a Refund or Replacement until January 31, 2024. Extended Holiday Replacement-Only Return PolicyQualifying purchases of products displaying the " Extended Holiday Replacement-Only Return Policy ", from November 1st, 2023 to December 25, 2023, are eligible for a Replacement until January 31, 2024. |