Câble de raccordement UTP Cat.6 GigaTrue Black Box EVNSL641-0006 6 pieds Transmission propre de données et vidéo
Câble de raccordement UTP Cat.6 GigaTrue Black Box EVNSL641-0006 6 pieds Transmission propre de données et vidéo
Black Box EVNSL641-0006
- Free Shipping
- Lifetime Garantie
- Retours de 30 jours.
- Neutre en carbone
Caractéristiques clés du produit
- GigaTrue Premium kabel gebouwd om de industrienormen te overtreffen
- Kabel getest tot 550 MHz, wat de 250-MHz CAT6-norm overtreft
- Bekabeling ETL-geverifieerd volgens ANSI/TIA-568-C2
- 50-micron vergulde contacten bieden superieure geleiding
- Connector ontworpen voor een in- en uittreklus van 750 cycli
- Deze kabel biedt superieure next-end crosstalk (NEXT) vergeleken met standaard CAT6 kabel
- Snagless boots voorkomen schade aan de connector door vastlopen tijdens installatie
- Deze kabel is ideaal voor 1000BASE-T, 100BASE-TX, 10BASE-T en andere high-speed toepassingen
heures
minutes
Informations d'expédition
Produits ads
Black Box
EVNSL641-0006
Return Policy |
Time to Return |
Standard Return Policy |
We offer a hassle-free 30-day returns policy for domestic (US) orders, excluding non-refundable items. Refund or Replacement within 30 days of the delivery date. All products that fall under the Standard Return Policy qualify for our 30-Day Hassle-Free Returns. Please see the section above for more details. |
Replacement Only Return Policy |
Replacement within 30 days of the delivery date. |
Manufacturer Only Return Policy |
Covered by the manufacturer's warranty. Please refer to the terms and conditions for the manufacturer's warranty or contact the manufacturer. |
Holiday Extended Return Policies |
Extended Holiday Return Policy.Qualifying purchases of products displaying the " Extended Holiday Return Policy ", from November 1st, 2023 to December 25, 2023, are eligible for a Refund or Replacement until January 31, 2024. Extended Holiday Replacement-Only Return PolicyQualifying purchases of products displaying the " Extended Holiday Replacement-Only Return Policy ", from November 1st, 2023 to December 25, 2023, are eligible for a Replacement until January 31, 2024. |