Módulo SFP+ 10GBASE-SR Extreme Networks 10301 Ethernet de 10 Gigabits distancia soportada de 300m
Módulo SFP+ 10GBASE-SR Extreme Networks 10301 Ethernet de 10 Gigabits distancia soportada de 300m
Extreme Networks 10301
- Free Shipping
- 1 año Garantía
- Devoluciones de 30 días
- Neutral en carbono
Características clave del producto.
- Garantía limitada de por vida para tranquilidad
- Compatible con Summit X350-48t Switch y Summit X350-24t Switch
- Compatible con una distancia de hasta 300 metros
- Longitud de onda óptica de 850 nm para un rendimiento fiable
- Tipo de conector LC para una instalación fácil
- 1 puerto 10GBase-SR para conectividad de alta velocidad
- Tecnología Ethernet de 10 Gigabits para transferencia rápida de datos
- Compatible con modo de fibra de un solo modo para un uso versátil
- Tipo de medio de fibra óptica para transmisión de señal fiable
- Aplicación en redes de datos para una conectividad mejorada
horas
minutos
Información de envío
Productos ads
Extreme Networks
10301
Return Policy |
Time to Return |
Standard Return Policy |
We offer a hassle-free 30-day returns policy for domestic (US) orders, excluding non-refundable items. Refund or Replacement within 30 days of the delivery date. All products that fall under the Standard Return Policy qualify for our 30-Day Hassle-Free Returns. Please see the section above for more details. |
Replacement Only Return Policy |
Replacement within 30 days of the delivery date. |
Manufacturer Only Return Policy |
Covered by the manufacturer's warranty. Please refer to the terms and conditions for the manufacturer's warranty or contact the manufacturer. |
Holiday Extended Return Policies |
Extended Holiday Return Policy.Qualifying purchases of products displaying the " Extended Holiday Return Policy ", from November 1st, 2023 to December 25, 2023, are eligible for a Refund or Replacement until January 31, 2024. Extended Holiday Replacement-Only Return PolicyQualifying purchases of products displaying the " Extended Holiday Replacement-Only Return Policy ", from November 1st, 2023 to December 25, 2023, are eligible for a Replacement until January 31, 2024. |