APC Rack PDU 2G, Switched, ZeroU, 30A, 100-120V, (24) 5-20R (AP8932)

APC Rack PDU 2G, Switched, ZeroU, 30A, 100-120V, (24) 5-20R (AP8932)
APC Rack PDU 2G, Switched, ZeroU, 30A, 100-120V, (24) 5-20R (AP8932)
APC Rack PDU 2G, Switched, ZeroU, 30A, 100-120V, (24) 5-20R (AP8932)

APC Rack PDU 2G, Switched, ZeroU, 30A, 100-120V, (24) 5-20R (AP8932)

APC by Schneider Electric AP8932

$2,311.00 $3,143.00 Save $832
Authorized Partner
Renewed
Excellent Condition
Availability: In stock , ready to be shipped .
  • Free Shipping
  • 2 Year Warranty
  • 30 Day Returns
  • Carbon Neutral

Input Voltage:

  • 208V
  • 100V,120V
  • 230VAC
  • 200V,208V,230V
  • 200V,208V

Output Voltage:

  • 208VAC
  • 100VAC,120VAC
  • 120VAC
  • 208VAC,230VAC
  • 200VAC,208VAC

Receptacle Detail:

  • 6xIEC60320C19
  • 24xNEMA5-20R
  • 10xNEMAL5-20R
  • 21xIEC60320C13
  • 14xNEMA5-15R
  • 12xIEC60320C13
  • 10xNEMA5-20R
  • 10xNEMA5-15R
  • 8xIEC60320C13
  • 3xIEC60320C19/C21
  • 21xIEC60320C13/C15
$2,311.00
FREE Returns
FREE Delivery
Order in the next

hrs

mins

to be delivered on

Shipping information

-
+
Ask Our Experts
Call Us Now
888.267.9566
Minimize
Info
Info Page
Reviews Top
×

×
  • Description
  • Tech Specs
  • Refund Policy

APC by Schneider Electric

AP8932-Excellent

APC Switched Rack Power Distribution Units (PDUs) enable advanced, user-customizable power control and active monitoring. Remote outlet level controls allow power on/off functionality for power recycling to remotely reboot equipment and restrict unauthorized use of individual outlets. Power sequencing delays allow users to define the order in which to power up or down attached equipment. Avoid circuit overload during power recovery and extend uptime of critical equipment by prioritizing the load shedding. Current metering provides real-time remote monitoring of connected loads. Switched Rack PDUs include real power monitoring, a temperature/humidity sensor port, locking IEC receptacles, and low profile circuit breakers. User-defined alarms warn of potential circuit overloads before critical IT failures occur. Users can access, configure, and control Switched Rack PDUs through secure Web, SNMP, or Telnet Interfaces and is complimented by APC Centralized Management platforms using InfraStruxure Central, Capacity Manager and Change Manager.

Return Policy

Time to Return

Standard Return Policy

We offer a hassle-free 30-day returns policy for domestic (US) orders, excluding non-refundable items. Refund or Replacement within 30 days of the delivery date. All products that fall under the Standard Return Policy qualify for our 30-Day Hassle-Free Returns. Please see the section above for more details.

Replacement Only Return Policy

Replacement within 30 days of the delivery date.

Manufacturer Only Return Policy

Covered by the manufacturer's warranty. Please refer to the terms and conditions for the manufacturer's warranty or contact the manufacturer.

Holiday Extended Return Policies

Extended Holiday Return Policy.

Qualifying purchases of products displaying the " Extended Holiday Return Policy ", from November 1st, 2023 to December 25, 2023, are eligible for a Refund or Replacement until January 31, 2024.


Extended Holiday Replacement-Only Return Policy

Qualifying purchases of products displaying the " Extended Holiday Replacement-Only Return Policy ", from November 1st, 2023 to December 25, 2023, are eligible for a Replacement until January 31, 2024.

FAQ

Related searches

Recently Viewed Products